At a glance

Structure
Railway bridge deck and ballast retention
Location
[to confirm]
System
Spray-applied polyurea membrane
Year
2022
Why it suited polyurea
Cures in minutes, so the corridor reopens inside the possession window

What was involved

  • Surface preparation back to sound concrete, with the deck profiled for adhesion.
  • Detailing at the ballast retention edges, where water would otherwise track down the structure.
  • Continuous spray-applied membrane across the deck — no laps, no seams.
  • Work sequenced around rail traffic, with the deck returned to service the same shift.

Infrastructure, industrial or anything on a fixed shutdown window — tell us the constraint and we will tell you what is possible.